What happens during a kitchen installation? A step-by-step guide.


Every successful kitchen renovation starts with careful planning.

If you’ve already chosen your kitchen supplier and have a completed design, we’ll review the plans to ensure everything is practical for installation. If you haven’t yet selected your kitchen, we can help arrange kitchen design, supply and installation through one of our trusted trade partners.

During this stage we’ll discuss:

  • Your lifestyle and how you use your kitchen
  • Storage requirements
  • Appliance locations
  • Lighting design
  • Plumbing and electrical requirements
  • Flooring and tiling options
  • Any building alterations that may be required

Taking the time to plan everything properly helps minimise unexpected costs, delays and changes once work begins.


Before your kitchen renovation starts, every detail is checked and confirmed.

This includes:

  • Kitchen layout
  • Cabinet sizes and positions
  • Appliance specifications
  • Plumbing locations
  • Electrical requirements
  • Worktop measurements
  • Flooring and wall finishes

Once everything has been agreed, we’ll provide a realistic installation schedule so you know exactly what to expect throughout your project.

Clear communication is something we’re proud of and helps ensure your kitchen renovation runs as smoothly as possible.


If we’re supplying your kitchen, we’ll help coordinate the ordering and delivery of your cabinets, appliances and associated materials.

If you’ve already purchased your kitchen from Magnet, Howdens, Benchmarx or another supplier, we’ll review the delivery before work begins to ensure everything required for the installation has arrived.

Checking deliveries in advance helps prevent unnecessary delays once your renovation is underway.


Before your new kitchen can be installed, the existing room needs to be prepared.

This stage may include:

  • Removing the existing kitchen
  • Disconnecting appliances safely
  • Isolating plumbing, gas and electrical supplies where required
  • Protecting surrounding floors and adjoining rooms
  • Removing old wall tiles or flooring
  • Carrying out plastering or minor building work if required

This can be the messiest stage of the project, but it’s essential for achieving a high-quality finish.


This is where your new kitchen really starts to take shape.

Our experienced team follows a carefully planned sequence to ensure every part of the installation is completed to the highest standard.

The installation will typically include:

  • Installing and levelling base units
  • Fitting wall and tall cabinets
  • Completing first-fix plumbing and electrical alterations
  • Installing worktops
  • Fitting splashbacks or wall tiling
  • Laying flooring where included
  • Positioning appliances ready for final connection

Because we provide all the required trades in-house, there’s no need for you to organise separate plumbers, electricians, carpenters, tilers or decorators.

Whether you’ve chosen a labour-only kitchen installation or a complete kitchen supply and installation service, we’ll manage the project from start to finish.


Once the main installation is complete, we move on to the finishing details that transform your kitchen into a beautiful, functional space.

This stage may include:

  • Connecting sinks and taps
  • Installing integrated appliances
  • Electrical testing and certification
  • Silicone sealing
  • Decorating and final paintwork
  • Adjusting cabinet doors and drawers for a perfect fit

Every kitchen is carefully inspected to ensure it meets both our own high standards and your expectations.


Before we leave, we’ll carry out a final walkthrough with you.

We’ll explain:

  • How your new kitchen works
  • Appliance documentation and warranties
  • Care and maintenance advice
  • Our 12-month workmanship warranty

We won’t consider the project complete until you’re happy with every detail.


Every kitchen renovation is different.

A small straightforward kitchen replacement may take around two weeks, while larger projects involving structural alterations, flooring, plastering or bespoke carpentry will take longer. The average full kitchen refurbishment is approximately 4 weeks, but it can really vary.

Before work begins, we’ll provide a realistic programme so you know exactly what to expect.


Unlike many kitchen companies, we don’t expect you to organise multiple contractors or coordinate different trades.

Our experienced team manages every aspect of your kitchen renovation, including carpentry, plumbing, electrics, tiling, flooring, decorating and general building work where required. This keeps your project organised, efficient and helps minimise delays.

Whether you’re looking for a labour-only kitchen installation using a kitchen you’ve already purchased, or a complete kitchen supply and installation package, we’ll guide you through every stage with clear communication, quality workmanship and attention to detail.

Established in 2006, we’ve built our reputation on delivering high-quality kitchen renovations across South London, South East London, Bromley and Kent, with customer satisfaction at the heart of everything we do.


Whether you’re replacing an outdated kitchen, modernising your home or planning a complete renovation, we’d be delighted to discuss your project.

Contact JW McDonald Kitchens & Bathrooms today for an initial estimate and discover how our experienced team can help bring your ideas to life.


We carry out kitchen renovations and kitchen installations throughout South London, South East London, Bromley and parts of Kent, including postcode areas BR1, BR2, BR3, BR4, BR5, BR6, BR7, SE2, SE3, SE4, SE6, SE8, SE9, SE10, SE12, SE13, SE19, SE20, SE21, SE22, SE23, SE24, SE25, SE26, SE27 and SE28.

If you’re unsure whether we cover your area, simply get in touch and we’ll be happy to help. Reach out on our contact page or call us on 0800 335 7772 or Whatsapp us on 07421 203625.